Highway Construction Training

starstarstarstarstar 5.0

Language: Hindi

Validity Period: 730 days

₹34026 including GST

PREVIEW  
Course Curriculum

  

Description

Course Curriculum

Introduction of Layers
How to read this course (9:00) Preview
Explanation of Embankment (11:00) Preview
Explanation of Sub-Grade (11:00) Preview
Explanation of Granular Sub- base (9:00) Preview
Explanation of Wet Mixed Macadam - 1 (11:00)
Explanation of Wet Mixed Macadam - 2
Explanation of Dense Bituminous Macadam (5:00)
Bituminous concrete layers
Explanation seal coat, Prime Coat, Tack Coat
Surveying Components Used in Highway
INTRODUCTION OF SURVEY
PROCEDURE OF SURVEY IN HIGHWAY (15:00)
COMPONENTS OF TYPICAL CROSS SECTION (8:00)
HOW FIND TOE WIDTH OF SUBGRADE LAYER (8:00)
PLAN AND PROFILE READING
TYPES OF TERRAIN (6:00)
TERRAIN
Chain age Point Marking
IMPORTANCE OF BENCH MARK (18:00)
Bench Mark
CONTROL POINTS
CONTROL POINTS
Road Lane width (7:00)
Road Lane width
CHAINAGE IN HIGHWAY (15:00)
CHAINAGE
Levelling by Auto Level & its calculation in Excel
STUDY OF REDUCE LEVEL AND MEAN SEA LEVEL
LEVEL TRANSFER BY AUTO LEVEL (7:00)
EASY WAY TO SET UP AUTO LEVEL
STAFF READING
EXPLAINATION OF PROFILE LEVELLING (18:00)
PERFORMING PROFILE AT SITE (18:00)
LEVELLING PROCEDURE AT DIFFRERNT LEVEL OR CHECHKING OF THICKNESS DIFFRERNT LEVEL
HOW TO CREATE LEVEL SHEET IN EXCEL (6:00)
Level Sheet Excel File
QUANTITY OF EARTH WORK WITH THE HELP OF FRL (6:00)
CALCULATION OF RL AT EVERY LAYER BY FRL
RL AT EVERY LAYER BY FRL
CUTTING FILLING BY AUTO LEVEL
GPS Coordinates
CORDINATES EXPLAINATION
GPS COORDINATES
Camber & its Calculation
CAMBER IN HIGHWAY AND ITS CALCULATION
Camber
CAMBER IN HIGHWAY AND ITS CALCULATION AT SITE (5:00)
Centerline Marking by Total Station
WHAT IS TRAVERS
Travers
EXPLAINATION OF CENTERL LINE
TOTAL STATION PARTS AND ITS USES (5:00)
TOTAL STATION SETUP (5:00)
CENTER LINE MARKING AT SITE BY TOTAL STATION (5:00)
Centerline COORDINATES
Highway Estimation
Drawing Explanation (13:00)
Drawings Used In Estimation
Data Take off from Drawing (22:00)
Highway Estimation Part - 1 (23:00)
Highway Estimation Part - 2 (8:00)
Highway Estimation Part - 3 (4:00)
Highway Estimation part - 4 (8:00)
Highway Estimation Part - 5 (10:00)
Estimation Sheet
Retaining Wall
Explanation of R.E Wall (7:00)
Estimation of R.E. Wall (7:00)
RE Wall Estimation sheet
BBS of R.E. Wall (27:00)
Retaining Wall BBS
RETAINING WALL BOQ (28:00)
RE Wall BOQ
Drain Line
Explanation of Drain
Drain Line Drawing Explanation (14:00)
Drain Drawing
Estimation of Drain Line
Estimation sheet of Drain
BBS of Drain Line
Drain Bar Bending Schedule
Explanation of Drain at site (5:00)
Drain Slope by Auto Level (7:00)
Level Transfer by Water Level pipe (7:00)
Bill of Quantity
BOQ Part-1 (Highway Construction) (19:00)
BOQ Part-2 (Highway Construction) (24:00)
BOQ Part-3 (Highway Construction) (26:00)
BOQ Sheet
Mixed Design of Wet Mixed Macadam
WMM Mixed Design Documents
Introduction of WMM Mix Design (7:00)
Introduction of Aggregate Gradation Test (13:00)
Aggregate Gradation Test
Individual sieve analysis for Gradation Test Part -1 (12:00)
Individual sieve analysis for Gradation Test Part -2 (11:00)
Blending of Aggregate & Stone dust (18:00)
Draw Graph as per MORTH specification for Gradation Test (14:00)
Introduction of Proctor Compaction Test (7:00)
Is Code 2720 part 8 Recommendation (7:00)
Sample preparation of Proctor compaction test (7:00)
Graph Prepare according to Proctor Compaction Test sheet (7:00)
Proctor compaction Test
Los Angles Abrasion Test (7:00)
Los Angles Abression Test
Aggregate Impact Value for WMM
AIV Test
Liquid limit and plastic limit by cone penetration method (15:00)
L.L
Flakiness & Elongation test for WMM (17:00)
F.I & E.I
Specific gravity & Water Absorption of 20mm Aggregate (15:00)
Specific Gravity and Water Absorption of Stone dust (15:00)
Water absoption
WMM material preparation in Plant (4:00)
WMM Mixed design final report sheet
Mix Design of Granular Sub base
GSB Mixed Design Documents
Final Report of GRANULAR SUB- BASE
GSB Gradation as per MORTH Specification (9:00)
Preparing sample for Gradation Test (15:00)
Individual sieve analysis for Gradation Test (18:00)
Blending of Aggregate & Stone dust (20:00)
Draw Graph as per MORTH specification for Gradation Test (9:00)
Aggregate Gradation Test
Proctor Compaction Test for GSB Material (11:00)
Preparing Graph For Proctor Compaction Test (11:00)
Proctor Compaction Test
Introduction of California Bearing Ratio Test (31:00)
Material Preparation of California Bearing Ratio Test (21:00)
Report sheet of California Bearing Ratio Test (18:00)
CBR Test
Aggregate Impact Value Test For GSB Material (18:00)
AIV
Liquid Limit & Plastic Limit of GSB (18:00)
Liquid Limit
Flakiness & Elongation Test For GSB (18:00)
F.I & E.I. Test
Specific Gravity & Water Absorption by wire mesh basket of 40mm aggregate (16:00)
Determination of Specific Gravity & Water Absorption of Aggregate if size is smaller than 10mm. (18:00)
Determination of Specific Gravity & Water Absorption of Aggregate if size is greater than 10mm. (16:00)
Water Absorption
Mixed Design of Dense Bituminous Macadam
Aggregate Impact Value for DBM (13:00)
Flakiness Index and Elongation Index Tests (13:00)
Specific gravity & Water absorption by wire mesh basket (13:00)
Specific gravity & Water absorption of Stone dust by Pycnometer (13:00)
Absolute Viscosity of Bitumen (13:00)
Mixed Design of Bituminous Concrete
Coming Soon
Test for Subgrade & Earthwork
Field Dry Density test by Core Cutter Method (2:00)
Rapid Moisture Meter Test (11:00)
Prepare sample material for Proctor Compaction Test (12:00)
Draw Graph as per Proctor Compaction Test (15:00)
Final Calculation for Sub - Grade & Earthwork (16:00)
Quantity Survey
Introduction of Quantity Survey (2:00)
Compaction Factor (8:00)
Quantity survey of WMM (24:00)
Final sheet of WMM (3:00)
Coming Soon
MORTH Specification
MORTH SPECIFICATION PDF
Clearing & Grubbing (16:00)
Earthwork
CLASSIFICATION OF EXCAVATED MATERIALS (16:00)
Embankment and Subgrade (16:00)
Sub -Bases
Granular sub-base (16:00)
Wet Mix Macadam Up to Spreading (12:00)
Wet Mix Macadam (COMPLETE) (12:00)
Bases & Surface Course
DBM (ABOUT MATERIALS) (12:00)
DBM (MIX DESIGN & PREPARATION OF BASE) (12:00)
DBM (BASE OF PRIME COAT & TACK COAT) (12:00)
DBM COMPLETE (12:00)
Bituminous Concrete
Bituminous concrete Materials (12:00)
Bituminous concrete (MIX DESIGN UPTO PREPARATION OF BASE) (12:00)
Other Items
Road Marking (12:00)
DISTANCE INDICATOR POSTS (12:00)
Traffic Signs & Overhead signs (12:00)
Billing as per BOQ mode
Coming Soon

Why this course?

Description

Enjoy Pre Lunching offer | Training will start from 15th August, so to enjoy offer benefit use Coupon code and get only at 8847 till 15th..

 

1 Introduction of Layers

2 Surveying Components Used in Highway

3 Chainage Point Marking

4 Levelling by AutoLevel & its calculation in Excel

5 GPS Cordinates

6 Camber & its Calculation

7 Centerline Marking by Total Station

8 Highway Estimation

9 Retaining Wall

10 Drain Line

11 BOQ

12 Mix Design of Granular Sub - Base

13 Mix Design of Wet Mixed Macadam

14 Sub Grade & Eartwork

15 Dense Bituminous Macadm

16 Bituminous Concrete

17 Quantity Survey

18 MORTH Specification (Ministry of Road Transport & Highway)

19 Billing As per BOQ Mode

20 Billing As per EPC Mode Engineering, Procurement, and Construction

Course Feedback

How to Use

After successful purchase, this item would be added to your courses.You can access your courses in the following ways :

  • From the computer, you can access your courses after successful login
  • For other devices, you can access your library using this web app through browser of your device.