Course Duration
- 3 Month / 90 Days Practical Training
- 3 Month Full Access to all Online Technical Courses.
- 4 Hrs. Daily Class Timing
- Online Software Support for 24 Months*
- 15 Days Field Visit
- 44 Days Practical Field Work Lecture
- 13 Days Interview & Project Case Study
- 6 Days LIVE Presentation
- 12 Days Home Preparation
Course Features
- Model Case Study for better understanding.
- Field Visit for practical application of work.
- Daily Presentation for Interview Preparation.
- You Tube Live Presentation
- Lifetime Support for Best Experience.
- Job Assistance
Step 1
First 15 days:
- INTRODUCTION
- CENTERLINE LAYOUT IN FIELD
- ESTIMATION
(Item wise detailed estimate of Building in Measurement Book with Excel Sheet).
- BOQ (Bill of Quantity) AS PER TENDER APPROVAL.
- DAILY PRESENTATION OF PREVIOUS CLASS
- LIVE PRESENTATION OF PROJECT SUBMISSION ON YOU TUBE WITH POWERPOINT.
Step 2
Next 15 days:
- BAR BENDING SCHEDULE ( BBS ) MANUAL
- (Bar Bending Schedule Of Footing, Column, Stirrup, Beam, One way &
Two way Slab, Circular Slab, Staircase, Chajja, Drain line, Pile, Pile Cap,).
- ADVANCE EXCEL SHEET FORMULA FOR BBS
- DAILY PRESENTATION OF PREVIOUS CLASS
- LIVE PRESENTATION OF PROJECT SUBMISSION ON YOU TUBE WITH
POWERPOINT.
Step 3
Next 15 days:
(Land levelling, Profile levelling, Contour mapping, Inverted levelling staff).
- BRIDGE TYPE CULVERT & DRAIN LINE
- ON SITE BUILDING MATERIAL TEST
- TOWNSHIP LAYOUT
- DAILY PRESENTATION OF PREVIOUS CLASS
- LIVE PRESENTATION OF PROJECT SUBMISSION ON YOU TUBE WITH
POWERPOINT.
Step 4
Next 15 days:
- QUANTITY SURVEY (Item-wise Details of building materials).
- MARKET SURVEY OF MATERIALS & MAKING REPORT.
- RATE ANALYSIS (According to current market rates & as per Indian standard).
- CONTRACTOR WORK RATE CONTRACT ( Overall, only Equipment, only Material, only Labour, Material + Labour, Material + Equipment, Labour + Equipment).
- DAILY PRESENTATION OF PREVIOUS CLASS
- LIVE PRESENTATION OF PROJECT SUBMISSION ON YOU TUBE WITH POWERPOINT.
Step 5
Next 15 days:
- BILLING WORK IN MEASUREMENT BOOK
(As per SUB DIVISONAL OFFICER Work).
(Item Wise Labour Contractor Bill & Slab Rate Bill)
( As per Balance Sheet of Site)
(For Controlling Wastage of material)
(As per Office of Economic Advisor of India)
- TENDERING ( General Contract Condition )
Step 6
Last 15 days:
- BRICKWORK LAYOUT
- CASE STUDY AS PER CONSULTANT ( Detailed Project Report )
- RESUME MAKING
- PORTFOLIO
- INTERVIEW SESSION
- TIPS & TRICKS FOR COMPANY CALLING
- FINALIZING INTERVIEW IN COMPANY
You Can Reach Us :-
Google Map Loaction - https://goo.gl/maps/hSL2J8mqAgCzti9C6
South Shivpuri, Punaichak, Rajbansi Nagar, Patna, Bihar 800023