There are no items in your cart
Add More
Add More
Item Details | Price |
---|
5.0 (ratings)
Validity Period: 180 days
Why this course?
2 Months Phygital Training : Total Fees 47,200 ₹ Pay in 7 Easy Instalment.
35% Fees During Training & Rest 65% Fees, After Completion of Training
2 Month Training Schedule
Estimation (15 Days):
➢ Introduction
➢ Township Layout
➢ Centreline Layout In Field
➢ Estimation (Item Wise Detailed Estimate Of Building In Measurement Book).
➢ BOQ (Bill Of Quantity) As Per Tender Approval.
➢ Daily Presentation Of Previous Class
➢ Live Presentation Of Project Submission On YouTube
Surveying (8 Days):
➢ Surveying By Auto-Level.
➢ Survey Intro , Autolevel Setup, Staff Reading.
➢ Rl Transfer By Hi Method.
➢ Contouring And Its Calculation Rise & Fall Method.
➢ Profile Levelling Calculation And Drawing Reading.
➢ Flexible Pavement Construction Process.
➢ Rigid Pavement Pavement Construction Process
➢ Inverted Levelling Staff & Slope Calculation.
Step 3 Quantity Survey 10 Days:
➢ Quantity survey (Item-Wise Details Of Building Materials).
➢ Market Survey of Materials & Making Report.
➢ Rate analysis (According To Current Market Rates & As Per Indian Standard).
➢ Contractor Work Rate Contract (Overall, Only Equipment, Only Material, Only Labour, Material + Labour, Material + Equipment, Labour + Equipment).
➢ Daily Presentation Of Previous Class
➢ Live Presentation Of Project Submission On you Tube.
Step 4 Bar Bending Schedule 8 Days:
➢ Bar Bending Schedule ( BBS ) Manual
➢ (Bar Bending Schedule Of Footing, Column, Stirrup, Beam, One Way & Two Way Slab, Circular Slab, Staircase, Chajja, Drain Line, Pile, Pile Cap,).
➢ Daily Presentation Of Previous Class
➢ Live Presentation Of Project Submission On you Tube.
Step 5 Billing 17 Days:
➢ Billing work In Measurement Book (As Per Sub Divisional Officer Work).
➢ Sub Contractor Bill (Item Wise Labour Contractor Bill & Slab Rate Bill)
➢ Daily Progress Report ( As Per Balance Sheet Of Site)
➢ Project Reconciliation (For Controlling Wastage Of Material)
➢ Project price Escalation (As Per Office Of Economic Advisor Of India)
➢ Tendering ( General Contract Condition )
➢ Brickwork Layout
➢ Case Study as Per Consultant ( Detailed Project Report )
➢ Resume Making
➢ Portfolio
After successful purchase, this item would be added to your courses.You can access your courses in the following ways :